Maintenance method of steel pipe
2020-06-23
1. For the completed steel pipe scaffold system, special personnel shall be set up to carry out structural inspection on the steel pipe scaffold every day to check whether the vertical pole and walkway plate sink or loosen, whether all fasteners of the steel pipe scaffold frame body slide and loosen, and whether the components of each part of the whole frame body are complete and complete.
2, should do a good job of steel pipe scaffold foundation drainage work, after each rain to the steel pipe scaffold frame body foundation for a comprehensive inspection, to prevent the steel pipe scaffold base water sinking.
3. The construction load of the operation layer of the steel pipe scaffold is prohibited to exceed 270kg/m2. It is not allowed to fix the cross bar support, cable wind rope, etc. on the steel pipe scaffold, and it is forbidden to hang heavy objects on the steel pipe scaffold frame body.
4. No one is allowed to dismantle any part of the steel pipe scaffold on the completed steel pipe scaffold system.
5. In case of strong winds, heavy fog, heavy rain and heavy snow above level 6, the steel pipe scaffolding operation shall be suspended immediately. Before resuming work, the steel pipe scaffolding must be checked to be erected without any problems before continuing the operation.