昌弘矿山机械

Steel pipe maintenance method

  • Categories:Other News
  • Author:
  • Origin:
  • Time of issue:2020-06-23
  • Views:0

(Summary description)1. The completed steel pipe scaffolding system should be staffed to perform structural inspections on the steel pipe scaffolding every day to check whether the uprights and walkway plates are sinking or loosening, and whether all fasteners of the steel pipe scaffolding frame are slipping or loosening Whether the components of each part of the frame are complete and complete.

2. The basic drainage work of steel pipe scaffolding should be done. After each rain, the foundation of the steel pipe scaffolding body should be thoroughly checked to prevent the base of the steel pipe scaffolding from sinking.

3. The construction load of the operation layer of steel pipe scaffolding is forbidden to exceed 270 kg/m2. It is forbidden to fix the cross bar support and cable wind rope on the steel pipe scaffolding, and it is forbidden to hang heavy objects on the steel pipe scaffolding rack body.

4. On the completed steel pipe scaffolding system, no one is allowed to arbitrarily dismantle any components on the steel pipe scaffolding.

5. When encountering strong wind, heavy fog, heavy rain and heavy snow in level 6 or above, the steel pipe scaffolding should be suspended immediately. Before resuming work, the steel pipe scaffold must be checked to ensure that there is no problem before continuing the operation.

Steel pipe maintenance method

(Summary description)1. The completed steel pipe scaffolding system should be staffed to perform structural inspections on the steel pipe scaffolding every day to check whether the uprights and walkway plates are sinking or loosening, and whether all fasteners of the steel pipe scaffolding frame are slipping or loosening Whether the components of each part of the frame are complete and complete.

2. The basic drainage work of steel pipe scaffolding should be done. After each rain, the foundation of the steel pipe scaffolding body should be thoroughly checked to prevent the base of the steel pipe scaffolding from sinking.

3. The construction load of the operation layer of steel pipe scaffolding is forbidden to exceed 270 kg/m2. It is forbidden to fix the cross bar support and cable wind rope on the steel pipe scaffolding, and it is forbidden to hang heavy objects on the steel pipe scaffolding rack body.

4. On the completed steel pipe scaffolding system, no one is allowed to arbitrarily dismantle any components on the steel pipe scaffolding.

5. When encountering strong wind, heavy fog, heavy rain and heavy snow in level 6 or above, the steel pipe scaffolding should be suspended immediately. Before resuming work, the steel pipe scaffold must be checked to ensure that there is no problem before continuing the operation.

  • Categories:Other News
  • Author:
  • Origin:
  • Time of issue:2020-06-23
  • Views:0
Information
1. The completed steel pipe scaffolding system should be staffed to perform structural inspections on the steel pipe scaffolding every day to check whether the uprights and walkway plates are sinking or loosening, and whether all fasteners of the steel pipe scaffolding frame are slipping or loosening Whether the components of each part of the frame are complete and complete.
 
2. The basic drainage work of steel pipe scaffolding should be done. After each rain, the foundation of the steel pipe scaffolding body should be thoroughly checked to prevent the base of the steel pipe scaffolding from sinking.
 
3. The construction load of the operation layer of steel pipe scaffolding is forbidden to exceed 270 kg/m2. It is forbidden to fix the cross bar support and cable wind rope on the steel pipe scaffolding, and it is forbidden to hang heavy objects on the steel pipe scaffolding rack body.
 
4. On the completed steel pipe scaffolding system, no one is allowed to arbitrarily dismantle any components on the steel pipe scaffolding.
 
5. When encountering strong wind, heavy fog, heavy rain and heavy snow in level 6 or above, the steel pipe scaffolding should be suspended immediately. Before resuming work, the steel pipe scaffold must be checked to ensure that there is no problem before continuing the operation.